Building The Lloydsman

20160323_141908 [11156]Forward bulkhead, foredeck, cross member and perimeter deck support started.

 

 

20160405_235449_resized [20604]

Bow thruster tube installed.

20160324_065214 [11155]Superstructure frame under construction.

20160405_235419_resized [20605]

Wood welders have clad first level and cut and fitted the middle deck.

20160422_151445_resized [32186]

Shaping the foam core for the main mast.